The foundation work continues. A lot of work goes into preparing for the new foundations. Before the forms are put in place, holes are drilled into the old foundation every 12 inches and re-bar is epoxied into each hole. Then the re-bar is wired together creating what looks like a thick steel fence. This adds strength to the concrete and strengthens the joint between the old foundation and the new.
I was shocked when Jeanne told me we have only been in the camper a total of a week and 2 days. I thought it was 5 weeks so far. A lot of work has happened in the past week or so, and maybe that is why it feels longer. Or maybe the fact that we are living in a space the size of our living room.
Its all good, and will be worth it.
Facebook won the battle
13 years ago
1 comment:
You are really moving fast, super fast! Living in tight places can be hard when you have children...
Hopefully they are being good. It will be worth it when you are done! Think of all the new space you will have! Love, Mom and Fred
Post a Comment